Town Hall Tuesday – Week 33

22/08/2017

Thanks very much to Kate last week – not quite sure how this week’s blog can top it… but as always there is plenty to report!

Ground Floor

• Stone repairs to old fire exit doorway

220817-gf-fire-exit
• The electrical containment in the ceiling void is ongoing

220817-m-and-e-2
• Limecrete has been curing for 8 days

This is the space taken by the old ladies and accessible toilets, just inside the front door on the left. It will be the new Town Council office once the Town Hall is finished.
This is the space taken by the old ladies and accessible toilets, just inside the front door on the left. It will be the new Town Council office once the Town Hall is finished.

• Heating pipes containment in ceiling void

220817-m-and-e-3

First Floor

• Stripping old paint from wood panelling

220817-stripping-the-wood-panels
• Ceiling has been plastered fully, and a distemper coat of paint applied

220817-ff-ceiling
• Cracks to the curved section of the ceiling are being repaired.
• Electrical containment from Ground Floor ceiling to First Floor

220817-m-and-e-gf-to-ff
• Radiator positions marked and piped
• Pivot Windows installed

Roof

• West elevation completely re-slated

roofing-to-west
• Leadwork to west clock tower face completed

• Dormer Leadwork completed on west elevation

• Started re-slating east elevation

220817-slating-east-elevation
• Cupola mouldings installed and ready to be painted

220817-cupola-mouldings

 

SOLD OUT! How To Look After Your Listed Building – 2 Day Course

19/20 Oct 17

Although all tickets are booked for this course, please email Sally on activities@brackleynorthants-tc.gov.uk if you are interested and you can be added to the waiting list. This course is aimed at anybody who works in or looks after listed buildings as an organisation, company or local council. Perhaps you are taking over a museum from … Continue reading SOLD OUT! How To Look After Your Listed Building – 2 Day Course